Before
After
Installed and painted door.
Replaced rotted clapboards and rotted sheathing, installed typar and flashing and trim.
Built a small 4′ X 6′ porch framed with P/T and I sheathed with Hemlock including the railings.
Built deck
Before
Removed old ramp and built a 10′ X 18′ deck out of pressure treated lumber.
WORK IN PROGRESS
Built 30′ handicap ramp to meet the ADA regulations 1″ rise for every foot in length.
Floor to ceiling Pine built in bookcases.
Floor to ceiling Pine built in bookcases.
Finished basement: built walls form laundry room and bathroom,drywall, mud, install trim and doors. Customer wanted to paint themselves.
Finished basement: built walls form laundry room and bathroom,drywall, mud, install trim and doors. Customer wanted to paint themselves.
Before
Built 16′ X 20′ deck with Trex composite decking and trademark railing system.
Work in progress
After
Removed metal hatch way and built dog house, insulated and sheathed with OSB. I installed (2) new doors. I also rebuilt the cellar stairs, repaired and painted concrete.
After
Before
Removed metal hatchway, built dog house, applied vinyl siding, andasphalt roof, insulated, hung drywall, built stairs, painted, installed door and trim work. Painted concrete.
Before
Removed small piece of Corian and built breakfast bar out of 100% Cherry lumber and applied (5) coats of polyurethane.
Stairs going down to the water with one small platform in W. Bath, Maine 16′ rock ledge.
New window and vertical blinds and trim work.
New Deck
New Deck
Extended existing deck to the pool
New front door and new Azek trim
Tongue and groove pine and insulation
Tongue and groove pine and insulation
Tongue and groove pine and insulation
Tongue and groove pine and insulation
Tongue and groove pine and insulation
Tongue and groove pine and insulation
Before
Trex composite decking on the porch completed with composite railings
Walk in closet aromatic Cedar
Walk in closet aromatic Cedar
Walk in closet aromatic Cedar